Our Experience
Transmission Infrastructure and Renewable Projects
NSW Projects
Hume link West JV: 200 km 500kV Transmission Line Design, including Tower Testing Support (Transgrid).
Transgrid TEKLA Detailing: 2x 330kV Tower Designs and Load Testing Support.
Snowy 2.0: 330kV 18 km Transmission Line Design and 3 types of Tower Testing.
HLW JV: 2x 330kV Steel Pole Designs and Detailing.
Hunter Transmission Project: 101 km 500kV Transmission Line Design (Energy Co).
VIC Projects
Golden Plains: 500kV Terminal Station Cut-In.
MTS-MOPS Line Design: 500kV Line Design.
Tower Design & Detailing: 500kV JA Suspension Tower and EC / ED Strain Tower Design.
Bulgana: Terminal Station Cut-In.
Stockyard Hill Wind Farm: 500kV Terminal Station Cut-In Design.
Crow lands Wind Farm: 220kV Cut-In Design.
REF CL: Zone Substation Rebuild.
Metro WA Projects
NBT-NT Transmission Line: 330kV 6 km Line Design and 3x Tower Testing (Western Power/Downer).
Perth CBD: Multiple 132kV Steel Pole Alignment Projects.
Pilbara, WA Projects
Roy Hill: 100 km 220kV Transmission Line Reviews (Owner's Engineer).
Rio Tinto: 220kV 40 km Transmission Line Detailed Design, including 3x Tower Testing.
Horizon Power: 220kV 6 km Transmission Line Detailed Design and 2x Tower Testing.